Work is the operative word here 😉
Spent the entire day yesterday sanding the hull, so that I could fiberglass it this morning, before work. The glassing job went routinely. I opted for only two 2" reinforcements at the ends.
On the interior, I filled the stems in with dookie and 'glassed in three sections, as usual. I saw that the ends of the stems extended at least 2" into the interior, so for the first time, I'm going to skip the "end pours" of epoxy, and simply drill through the wood for the rigging.
'Glassing the underside of the deck went routinely.
On second thought, those 2" reinforcing strips looked pretty sparse, so I added 4" strips on top.
No comments:
Post a Comment